← Funder Obligations
High Risk

Changing Places Toilets Scotland Fund

Inspiring Scotland

Award£1,309
PeriodJanuary 2025
CDT Lead
Reference
Katriona Harding [email protected]0131 442 8760

No CDT lead assigned. Build payment blocked by outstanding planning permission and PAMIS design approval.

Funder Expectations

Purpose

Fund installation of a Changing Places Toilet (CPT) at Cultybraggan Camp, meeting the needs of people with complex disabilities who cannot use standard accessible toilets.

Expected Outcomes
  • Changing Places Toilet built and operational at Cultybraggan Camp
  • Facility meets PAMIS design standards and is accessible to CPT users
  • CDT increases accessibility of the camp for visitors with complex needs
Grant Conditions
  • Planning permission must be obtained before build payment is released
  • Building warrant (if required) must be in place before build
  • Technical design must be approved by PAMIS before build payment released
  • Monthly progress reports submitted to Inspiring Scotland
  • Assigned CDT project lead to manage delivery and communicate with funder
KPIs / Targets
CPT built and operationalWithin grant period
Monthly reportsSubmitted on time each month
Reporting Notes

Katriona Harding is the programme contact ([email protected], 0131 442 8760). Inspiring Scotland sends monthly prompts. Build payment is split from initial grant — conditions must be met before second payment released.

Obligations(5)

AdminAction RequiredDue 31 May 2026

Assign a CDT lead for this project

No internal owner identified. Fiona Blacke received original offer letter as Chair but no project lead is managing delivery.

ReportAction RequiredDue 1 Jun 2026monthly

Monthly progress report to Inspiring Scotland

Inspiring Scotland sends monthly prompts. Finance/spend report submitted 6 May 2026 (acknowledged). April report appears to have been submitted.

ConditionAction Required

Obtain planning permission (required before build payment released)

Confirmed outstanding as at 31 March 2026. Build grant payment is blocked until this is obtained.

ConditionAction Required

Obtain building warrant (if required)

Required alongside planning permission before build payment.

ConditionAction Required

Get technical design approved by PAMIS (Promoting a More Inclusive Society)

PAMIS design approval is a grant condition before build payment is released.