CDT design review · first draft

Cultybraggan map design studio

Five connected map treatments for different jobs. Every concept uses geometry and number positions extracted directly from the formal 2021 vector plan, with its typography and presentation completely replaced.

Viewing 01Clean numbered site plan

Leases, maintenance and formal records

01

Authoritative base

Clean numbered site plan

A restrained permanent reference: the camp geometry and building identifiers take priority over branding.

Comrie Development Trust

Cultybraggan Camp

Building identification planNorth ↑
123458910121321232425333435363738391052211A15A16171819202627283031324142434445461061071081091410147484950515253545556575859606162636468697071737475A76A77A7879808687888990911048584838265/662915B15C77B76B75B6/7216772200N
CDT-MAP-01Concept issue A27 July 2026Verify 2021 plan against current site before production

Recommended production family

One verified master, four controlled derivatives

Source of truth01 Master plan
Staff02 Operations
Public03 Visitor
Digital04 Interactive
Story05 Heritage

The master geometry now drives every derivative. A survey technician should verify any physical changes since 2021; the remaining versions can then be exported without re-entering or repositioning hut numbers.